All posts by srivers

Updates

06/25/2025:  The geometry for the DLR  CRM-HL Ultra High Bypass Ratio Nacelle, Pylon and Chine was added to the Geometry page of the CRM-HL area

05/21/25: The CRM-HL reference geometry CAD files were updated to the latest version

09/15/21: The link to the ETW high speed CRM test data has been updated.

10/30/20: The DPW6 Geometries have been added to the Geometry menu.